The DC Code: § 47-2711 Riparian permits.

Index47 Taxation, Licensing, Permits, Assessments, and Fees. (Refs & Annos)

Riparian Permits Schedule

Fees required by the Rules and Regulations for the Government of Riparian Rights and Water Privileges in the District of Columbia.

Fees for permits to fill or dredge, construct, reconstruct or repair any structure shall be as follows:

Fee

Work costing up to $500 ....................................... $ 9.00

Work costing from $501 to $1,000 ............................... 14.00

Each additional $1,000 of increased cost ....................... 14.00

excess of the cost of inspection to verify no work having been

done, based on $10 per inspector hour, the cost of any

engineering examination time previously devoted to approval of

plans, based on $15 per hour, plus $14 administrative costs of

"issuance and refund", shall be refunded ......................... 14.00

when the District is satisfied that no more work will be done

under the permit, the fee in excess of the cost of any

engineering plans examination based on $15 per hour, inspections

costs based on $10 per hour, plus $14 administrative costs of

"issuance and refund", shall be refunded ......................... 14.00

Provided: That request for refund shall be made within 6 months from date of issuance and the permit and receipt are returned to the Permit Branch.

a
The schedule of fees to be charged by the District of Columbia for the issuance of riparian permits is hereby established and set out as follows:
b
Refunds: A refund of permit fee shall be made as follows:
1
When no work has been done under authority of permit the fee in
2
When work authorized by permit has been only partially done and
c
Penalty: The penalty for a permit to abate notice of doing work without a permit shall be 50% of the fee.
d
Waiver of permit fees: No permit fee shall be charged when supported by evidence indicating that the applicant is under contract or subcontract to perform the following:
1
Work done exclusively for the District of Columbia.
2
Work done under contract for the District.

Historical and Statutory

Prior Codifications 1981 Ed., § 47-2711. 1973 Ed., § 47-2211. Legislative History of Laws For legislative history of D.C. Law 1-82, see Historical and Statutory Notes following § 47-2702. DC CODE § 47-2711 Current through December 11, 2012

Credits

(Sept. 14, 1976, D.C. Law 1-82, title II, § 201, 23 DCR 2461; enacted, Apr. 9, 1997, D.C. Law 11-254, § 2, 44 DCR 1575.)